Pre’s Trail Restoration Project
This is a finished section with gravel base and bark top layer, crowned slightly for drainage. The entire trail will be reworked in this manner, and groomed regularly to maintain its integrity. Volunteers are needed to assist with trail upgrade work. Click here for information.

Donations are needed to purchase materials to finish the restoration project and maintain the trail in the future. Please make checks out to Prefontaine Trail Restoration and mail to:

Prefontaine Trail Restoration
P.O. Box 10825
Eugene, OR 97440

Thank you!




Above is a sequence showing how the trail upgrade progesses from a pile of gravel to finished section. The last image points out an area that needs complete restoration, where there is no gravel or bark and roots protrude through the soil.

copyright© 2005-2007 Oregon Track Club. All rights reserved.